Ford 99-03 7.3L Stage 2 LONG LEAD Injector Set 25 Percent Over Dynomite Diesel
Ford 99-03 7.3L Stage 2 LONG LEAD Injector Set 25 Percent Over Dynomite Diesel
Ford 99-03 7.3L Stage 2 LONG LEAD Injector Set 25 Percent Over Dynomite Diesel

Part Number:

Ford 99-03 7.3L Stage 2 LONG LEAD Injector Set 25 Percent Over Dynomite Diesel

Category: Fuel Injector

Core Charge

QTY

-
+

SHARE


Description


Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 2 injector set that's been fully balanced with 140cc injector bodies and 25 percent over nozzles. Comes with long lead injector for cylinder #8.

Approximately 75-100 RWHP gains over stock with proper supporting modifications. Great for a hot street truck with light duty towing. Turbo upgrade mandatory if towing frequently or heavy.

Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-2

Details:

  • Liter: 7.3
  • Engine: Powerstroke
  • Years: 1999-2003
  • Fuel Type: Diesel
  • Condition: New
  • Not For Sale In California

CALIFORNIA WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov

Additional Information


Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Curabitur augue
  • sollicitudin mauris
  • Pellentesque mauris
  • sollicitudin consectetur
  • reprehenderit augue

RELATED PRODUCTS