Part Number:

Ford 99-03 7.3L Individual Stock #8 LONG LEAD Injector Dynomite Diesel


SHARE


Description


Ford 99-03 7.3L Powerstroke Injector: Brand New (not reman) long lead injector intended for cylinder #8 on some 99-03 7.3L engines. Stock power level injector. Sold individually with all the latest revisions.

Note: This particular injector is solely intended for the #8 cylinder on some engines which came equipped with what's known as a long lead injector installed in that cylinder. If you are unsure what your engine came equipped with or do not want to take the time to check then order DDP ADNEW for the #8 cylinder and the other seven cylinders if needed.

Core Charge Applies

Details:

  • Liter: 7.3
  • Engine: Powerstroke
  • Years: 1999-2003
  • Fuel Type: Diesel
  • Condition: New

CALIFORNIA WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov

Additional Information


Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Curabitur augue
  • sollicitudin mauris
  • Pellentesque mauris
  • sollicitudin consectetur
  • reprehenderit augue

RELATED PRODUCTS