
Part Number:
Ford 99-03 7.3L Stage 1 LONG LEAD Injector Set 15 Percent Over Dynomite Diesel
SHARE
Description
Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 1 injector set WITH long lead injector for cylinder #8. New injectors have been fully balanced with 140cc injector bodies and 15 percent over nozzles. Approximately 50 RWHP over stock. Safe on stock trucks. Excellent for towing applications.
Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-1
Details:
- Liter: 7.3
- Engine: Powerstroke
- Years: 1999-2003
- Fuel Type: Diesel
- Condition: New
- Not For Sale In California
CALIFORNIA WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
Additional Information
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.
Curabitur augue
- sollicitudin mauris
- Pellentesque mauris
- sollicitudin consectetur
- reprehenderit augue
RELATED PRODUCTS
